Mission 001

The first flight of The Guinea Pig, our 600 kg suborbital rocket, from the FAR launch site in California. Target window: late 2027. Minimum: the 100 km edge of space. Goal: ~150 km.

Phase 1: The Guinea Pig
The Guinea Pig proof vehicle

The Build
Sequence

  1. Applications

    Founding team recruited across propulsion, structures, avionics, software and business.

  2. Design & Fundraising

    Big Piggy engine and vehicle design, flight simulations and fundraising for hardware and the engine test stand.

  3. Build & Development

    Workspace set up, test stand built, and avionics and recovery systems developed in parallel.

  4. Test & Integrate

    Subsystem testing, including Big Piggy hot fire on the test stand, then final integration and launch preparation.

  5. Launch Window

    The Guinea Pig flies at the FAR launch site, aiming for 100 km. Flight data and a results write-up follow.

After the Flight

We will document the build and the flight, then publish the flight data and a results write-up. Those numbers set the design margins for Spark.

Phase 1: The Guinea Pig, specs and budget
Follow the Build

Work with Us

Investors, launch customers, suppliers and people who want to build rockets. Tell us which you are and what you need, and the right person on the team will reply.

Get in Touch